WALT MORROW
WMB Builders, Inc.
WALT MORROW

Recent Remodeling Project


This project was an approximately 3500 square foot addition.  The project had been started by another contractor.  We were asked to take over the job and bring it to completion.  To accomplish this we needed to create a working set of drawings based on the existing frame work.  After many hours of discussion with the owners we developed a vision of what they wanted their home to look like.  The biggest complication of the project was matching the roof connections from a simple structure to the more complex addition.

 

BEFORE AND AFTER PICTURES

 

This is the rear of the addition during construction.

 

This is the rear of the addition at completion.

This is the cylinder during construction

This is the cylinder at completion

Inside of the cylinder during constuction

Circular Stairs

Circular Shower

Ceiling Treatment in the Octagon Room

Other finishes on the cylinder

The Octagon Living Room during Construction

 

The Octagon Living Room at Completion

 

The Trophy Room Ceiling with Transom Windows

Fireplace in Octagon Living Room during Construction

Fireplace in Octagon Living Room at Completion

Trophy Room during Construction

Trophy Room at Completion

Trophy Room Ceiling

Trophy Room Interiors

The Expanded Kitchen.  The Owners loved their existing cabinets.  We were able to re-use all but one and added new cabinets to match the existing cabinets.

The connection to the existing house

Outdoor living space with deck, paver patio, and fire pit.

 

Home  |  Remodeling  |  Photo Gallery  |  Building Lots  |  Floor Plans  |  Reports  |  Calculators  |  Contact Us  |  Blog

Privacy Policy  |  Site Map  |  Links  |  For Agents  |  Profile  |  Sign In

©2006-2012 WMB Builders, Inc.